Tuesday, January 17, 2023

Main cabin walls in place

Over the past couple days we’ve been putting up main cabin wall sections. There are 11 wall sections including the 45-degree section that will hold the front door. This project would have been a lot simpler if I had made the floor plan a bit simpler, but then we would have ended up with an barely usable tiny hut on a relatively huge platform.

2x4s with clamps serve as a visual reference for how we plan to make the loft and roof

Now we begin working on the upper loft section. The goal for this section is to have a large enough area to comfortably sleep without adding too much more material to the structure. It’s probably going to be a challenge matching up all the loft wall sections with the various angles of our cannibalized wall sections.